>
QUOTE (jmeyer @ Aug 17, 2009 - 5:37 PM)

>"Surely" and what spend a month doing so? When is the last time you pulled two dashes apart, cut out two firewalls, weld all new HVAC brackets, wire it all back together, do a motor swap, and swap suspension. I think I saved about a month of labor and 2 bottles of asprin.
taking dash out aint hard did a few weeks back,
could you not have left it left hand drive?
anyway though looks fine to me and the weld will always be stronger than the steel plate. the door lining up like that is a creit to your measuring surely a nervy bit that must have been!