Over 1M Posts • 84K Topics • 9K Authors

Finally, it begins.... - 6G Celicas Forums

Topic #9144 10 posts Started by SpedToe169
I finally have almost all the stuff I need to get moving on this project. Its an insane amount of stuff and I'm still going to have to fabricate a few things but all the big stuff is finally here. As some of you know, I bought Charlie97L's turbo setup with the intent of modifying it and improving it. I sent him money on Nov 5th and finally got the last of the stuff today.

Garrett t3/t4
Tial 35mm wastegate
HKS SSQ BOV
JGS Equal Length Manifold (the last one produced I believe?)
Turbo XS HP-MBC
Bell Engineering RR-FPR
Supra Intercooler (later to be replace by a custom intercooler with sparco core)
Venom Injectors (320cc I believe, have to look)
Walbro 320gph supra turbo fuel pump
SAFC-II (already on the car)

I'll be fabricating my own downpipe and full exhaust in mandrel bent 3" stainless. Haven't decided how I'm going to do the wastegate dump yet...might be a divorced wastegate to be really obnoxious.

I've got a spare tranny and a spare motor to build. The plan goes like this.

Port the manifold, the turbo and anything else I can get my hands on. Finish porting my intake. Put the turbo system on the car, get the bugs worked out, make about 180hp at the wheels.

At that point hopefully I'll have some money saved up to build the spare motor and tranny. The tranny will be another C52 with a phantom grip limited slip and a full ground up rebuild (bearings, synchros, seals, etc).

The motor I haven't totally decided on. I think I'm going to have forged pistons made for it but use all other stock internals. I'll beam polish, magnaflux, and shot-peen the rods, the crank will be magnafluxed, knife-edged, and shot peened (counterweights will be lightened by the knife-edge process). The entire rotating assembly will be balanced and reassembled with ARP fastners. I will port the head and it will get a 5-angle serti valve grind. Cams will be stock with stock timing. This motor should be strong enough to take about 12-13psi on 93 pump gas. The rev limit will remain stock at 6750. I'll likely increase the charge pipe to 2.5" aluminum and upgrade the intecooler after all this is done.

I'm hoping for 220hp at the wheels with minimal lag and good torque when all is said and done. I'm not going for all out power (at least for a while), I'm more interested in getting the reilability to the point where I feel good about driving it everyday. I should be able to get the weight of the car down to around 2200lbs (no driver) which should result in a pretty damn quick and fun to drive car.

I'm excited. >biggrin.gif>
how do you plan on getting the cars weight down that much?!
i think stock weight is like 2500lbs..
Did you get the aluminum flange for the SSQ? It'll make things easier cuz u gotta mount it on the first bend on the IC thru welding.

MyFlickrMyeBay_Perpetual Aperture_
Hey speedtoe Charlie97L was supposed to send me his short shifter, but he won't reply to my emails.

I already paid him $105 for it and he said his grandpa died and he was having some problems and then he said he sold his car.

After that he said he would refund me the money which never happened.

I was hoping if you were still in contact with him can you tell him to give me my money back.
None of the above. 7A. I just have to show everybody its not worthless.
Oh yeah i forgot u werent using stock IC.

MyFlickrMyeBay_Perpetual Aperture_
-integra_killer+Jan 30, 2004 - 11:40 AM
Yeah, the external WG shouldn't be a problem on the log manifold. Just put it as close to the flange as you can (hard to do, I know). I'm debating how I want to do my wastegate, if I want to route it back into the exhuast, or vent it to atm. I've never heard one, I would imagine they're pretty loud. Might be kinda cool tho.